International Speedway Corporation (ISC) retained GCI Consultants as the building envelope consultant for the International Motorsports Center (IMC), an eight-story, 184,500-square-foot corporate headquarters in Daytona Beach, Florida. Built as the joint headquarters for NASCAR and ISC, the facility today serves as NASCAR’s Daytona Beach headquarters and is also home to the International Motor Sports Association (IMSA). GCI’s NASCAR building envelope consulting services supported the project from design and submittal review through construction inspections and field testing.
Designed by Gensler and constructed by BE&K Building Group, the headquarters incorporated a complex mix of curtain wall and glazing, waterproofing, roofing, weather barriers, metal panels, and other exterior envelope components. GCI focused closely on how these systems were integrated and installed throughout construction. When heavy rain later resulted in water intrusion, GCI was engaged for an additional forensic investigation to help identify potential sources, develop remediation recommendations, and perform follow-up inspections of the affected areas.
NASCAR Building Envelope Consulting Services
GCI’s original scope centered on three primary areas: glass and glazing, waterproofing, and roofing.
Our team reviewed architectural plans, specifications, shop drawings, and product submittals; participated in pre-installation coordination; performed construction-phase site inspections; and observed field testing. The work included evaluation of Florida Product Approval requirements, exterior wall and weather-barrier conditions, roof and terrace waterproofing, parapets, drains, scuppers, sealants, and the interfaces between adjacent envelope systems.
As construction progressed, GCI also performed additional shop-drawing review, inspections, and investigative services as conditions in the field required further evaluation.
1. Glazing, Waterproofing, and Field Performance
Curtain wall and glazing installation during construction of the International Motorsports Center.
GCI’s glazing review identified several items requiring clarification before and during installation. These included curtain wall anchoring conditions requiring confirmation relative to the Florida Product Approval, questions regarding the specified glass configuration, and impact-resistant glazing requirements.
Engineer-certified calculations were provided to document the proposed curtain wall anchoring approach, and GCI requested supporting laboratory information for the glass configuration.
Field testing provided another important measure of performance. When project documents presented different water-test pressures, GCI recommended retaining the higher specified requirement. GCI later witnessed water-infiltration testing of four curtain-wall specimens conducted in general accordance with ASTM E1105, “Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls, by Uniform or Cyclic Static Air Pressure Difference.”
GCI’s field inspections also documented conditions at weather barriers, flashing, sealants, and waterproofing transitions that warranted additional coordination or follow-up before adjacent construction concealed the affected areas. These observations gave the project team an opportunity to review and address envelope details while they remained accessible.
This focus on system interfaces was a key part of the NASCAR building envelope consulting work. The glazing, waterproofing, roofing, and exterior walls could not be evaluated as isolated components; their connections had to work together for the enclosure to manage water effectively.
2. Roofing, Water Intrusion, and Corrective Work
GCI’s roofing involvement began before installation, with review of several design and coordination conditions involving roof drainage, topping slabs, waterproofing transitions, and manufacturer requirements.
Exterior wall weather barrier installation during construction of the International Motorsports Center.
During construction, GCI observed roof membrane installation and flood testing and provided recommendations as field conditions evolved. During one flood test, leakage was localized to a pipe penetration. The affected area was addressed and isolated for retesting so unrelated work could continue.
Later, manufacturer testing identified portions of the roof topping membrane that required additional coating to satisfy warranty requirements. GCI continued documenting roof conditions and follow-up work involving the membrane, drains, scuppers, equipment pads, and related details.
A separate challenge arose after heavy rain resulted in unanticipated water intrusion within the building. GCI was engaged to perform a forensic investigation in accordance with ASTM E2128, “Standard Guide for Evaluating Water Leakage of Building Walls” to help identify the source of the leakage, develop remediation recommendations, and conduct follow-up site inspections of the affected areas.
GCI evaluated waterproofing transition conditions and other potential water-entry locations at the parapets and adjoining envelope systems an coordinated its findings with the project team and product manufacturer. Follow-up inspections extended to the building interior, where GCI evaluated moisture-affected walls and insulation before replacement drywall was installed and documented the drying, removal, or replacement of affected materials as the work progressed.
The investigation gave the project team a clearer understanding of conditions and documented information to support the remediation process.
3. Supporting a LEED Gold Project
The International Motorsports Center was designed in accordance with the LEED Green Building Rating System for New Construction and ultimately achieved LEED Gold certification.
GCI’s work supported the performance of the building envelope throughout the project. Project specifications included LEED-related product and material requirements, and waterproofing and air-barrier submittals reviewed by GCI included LEED criteria documentation. Through our work on the glazing, air and weather barriers, roofing, waterproofing, field testing, and construction quality control, GCI contributed to the quality, durability, and water-management performance of the building enclosure.
Results and Impact
GCI’s involvement provided continuity from document and submittal review through construction, testing, investigation, and follow-up evaluation.
Key documented results included:
- Four curtain-wall specimens tested with no observed water infiltration.
- Curtain wall anchoring conditions documented through engineer-certified calculations.
- Weather-barrier, flashing, sealant, and waterproofing conditions evaluated while affected areas remained accessible for coordination and follow-up.
- A roof flood-test leak localized to a specific pipe penetration, allowing the affected area to be addressed and retested.
- Parapet and roofing conditions evaluated and tracked as follow-up work progressed.
- Construction-phase water intrusion investigated, with potential entry conditions evaluated and moisture-affected interior materials reviewed before restoration.
- Manufacturer testing identified roof membrane areas requiring additional coating to satisfy warranty requirements.
The NASCAR building envelope consulting project demonstrates the value of maintaining building envelope involvement throughout construction. By following the exterior systems from the design documents into the field, GCI helped the project team evaluate conditions, verify performance, coordinate solutions, and respond effectively as construction progressed.
The completed International Motorsports Center became the joint corporate headquarters for NASCAR and International Speedway Corporation. Following ISC’s merger into NASCAR, the facility continues to serve as NASCAR’s Daytona Beach headquarters and is also home to the International Motor Sports Association.
Addressed Exterior Building Enclosure Systems
The International Motorsports Center (IMC) is an eight-story, 184,500-square-foot corporate headquarters in Daytona Beach, Florida, located across from Daytona International Speedway. Completed in 2009, the building was developed as the joint headquarters for NASCAR and International Speedway Corporation (ISC) and today serves as NASCAR’s Daytona Beach headquarters and the home of the International Motor Sports Association (IMSA). The LEED Gold-certified facility features a distinctive motorsports-inspired design and remains a prominent part of Daytona Beach’s racing and corporate landscape.